keeping northern australia connected

QLD Schedules

Queensland Shipping Schedules Only

 

HORN ISLAND


* ETA's change due to operational requirements so be sure to check back regularly
* PC (Pre-Consignment paid) and all AQIS requirements completed. If AQIS clearance isn't completed, we cannot carry the freight.
* Backload Freight needs to be dropped off as follows:
Trinity Bay
- 3pm Tuesday for vehicles, boats & over-dimensional cargo
- 12pm Wednesday for all other freight
- Ready for collection in Cairns from 11am the following Tuesday
Newcastle Bay
- 12pm Friday for all freight
- Ready for collection in Cairns from 11am the following Friday
* All freight needs to packaged for sea carriage

VoyageGeneral Cargo & DG ReceivalFreezer / Chiller
Receival
Departure DatePlanned ArrivalUpdated ETA
TBNF1713 Fri 24/03 11am-4pm & Mon 27/03 7:40am-4pm Mon 27/03 6am-2pm Tues 28/03 Thu 30/03 6am  
NBNF1713 Wed 29/03 & Thu 30/03 7:40am-4pm (Essentials Only) Freezer Wed 29/03 6am-2pm / Chiller Thu 30/03 6am-2pm Fri 31/03 Sun 2/04 6am  
TBNF1714 Fri 31/03 11am-4pm & Mon 3/04 7:40am-4pm Mon 3/04 6am-2pm Tues 4/04 Thu 6/04 6am  
NBNF1714 Wed 5/04 & Thu 6/04 7:40am-4pm (Essentials Only) Freezer Wed 5/04 6am-2pm / Chiller Thu 6/04 6am-2pm Fri 7/04 Sun 9/04 6am  
TBNF1715 Fri 7/04 11am-4pm & Mon 10/04 7:40am-4pm Mon 10/04 6am-2pm Tues 11/04 Thu 13/04 6am  
NBNF1715 Wed 12/04 & Thu 13/04 7:40am-4pm (Essentials Only) Freezer Wed 12/04 6am-2pm / Chiller Thu 13/04 6am-2pm Fri 14/04 Sun 16/04 6am  
TBNF1716 Tues 18/04 7:30am-12pm Tues 18/04 6am-12pm Tues 18/04 Thu 20/04 6am  
NBNF1716 Wed 19/04 & Thu 20/04 7:40am-4pm (Essentials Only) Freezer Wed 19/04 6am-2pm / Chiller Thu 20/04 6am-2pm Fri 21/04 Sun 23/04 6am  

. . . CENTRAL


* Central Island group includes Coconut (Poruma), Warraber (Sue) and Yam (Iama)
* ETA's change at short notice due to operational requirements so be sure to check back regularly.  This schedule will be updated each Monday morning by 9am and also whenever there is a change of ETA.  
* The Newcastle Bay carries all freight ex Cairns.  Horn Island (Ngurupai) is the trans-shipment hub for the freight to travel to the Central Islands on one of the Malu vessels.
* Back-loading needs a Pick-up form, PC (Pre-Consignment paid) and all AQIS requirements completed. If AQIS clearance isn't completed, we cannot carry the freight.
* All freight to be backloaded (once the above is finalised - Pick Up Form, PC & AQIS Clearance) can only be received at the ramp whilst the vessel is in.
* 10' containers at 2.5 tonne are the maximum size/weight available to be transported. 20' containers are not available.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to email/otsioog)(seaswift.com.au.
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

VoyageGeneral Cargo
& DG Receival
Freezer / Chiller
Receival
Departure DatePlanned ArrivalUpdated Arrival
OTCT1713 Wed 22/03 & Thu 23/03 7:40am-4pm Freezer Wed 22/03 6am-2pm / Chiller Thu 23/03 6am-2pm Fri 24/03 Wed 29/03 COC, WAR, YAM  Thur 30/3 COC, WAR, YAM
OTCT1714 Wed 29/03 & Thu 30/03 7:40am-4pm Freezer Wed 29/03 6am-2pm / Chiller Thu 30/03 6am-2pm Fri 31/03 Wed 5/04 COC, WAR, YAM  
OTCT1715 Wed 5/04 & Thu 6/04 7:40am-4pm Freezer Wed 5/04 6am-2pm / Chiller Thu 6/04 6am-2pm Fri 7/04 Wed 12/04 COC, WAR, YAM  
OTCT1716 Wed 12/04 & Thu 13/04 7:40am-4pm Freezer Wed 12/04 6am-2pm / Chiller Thu 13/04 6am-2pm Fri 14/04 Wed 19/04 COC, WAR, YAM  
OTCT1717 Wed 19/04 & Thu 20/04 7:40am-4pm Freezer Wed 19/04 6am-2pm / Chiller Thu 20/04 6am-2pm Fri 21/04 Wed 26/04 COC, WAR, YAM  

. . . EASTERN


 * Eastern Island grouping includes Darnley (Erub), Murray (Mer), Stephen (Ugar) & Yorke (Masig).
*** Denotes weeks when Stephen Island is serviced***
* ETA's change at short notice due to operational requirements so be sure to check back regularly.
* The Newcastle Bay carries all freight ex Cairns and Horn Island (Ngurupai) is the trans-shipment hub for freight to travel to the Eastern Islands.
* Back-loading needs a Pick-up form, PC (Pre-Consignment paid) and all AQIS requirements completed. If AQIS clearance is required and isn't completed, we cannot carry the freight.
* All freight to be backloaded (once the above is finalised - Pick Up Form, PC & AQIS Clearance) can only be received at the ramp whilst the vessel is in.
* 10' containers at 2.5 tonne are the maximum size/weight available to be transported. 20' containers are not available.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to email/otsioog)(seaswift.com.au
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

VoyageGeneral Cargo
& DG Receival
Freezer / Chiller
Receival
Departure DatePlanned ArrivalUpdated Arrival
OTFE1713 Wed 22/03 & Thu 23/03 7:40am-4pm Freezer Wed 22/03 6am-2pm / Chiller Thu 23/03 6am-2pm Fri 24/03 Mon 27/03 Tues 28/3 MUR
OTFE1714 Wed 29/03 & Thu 30/03 7:40am-4pm Freezer Wed 29/03 6am-2pm / Chiller Thu 30/03 6am-2pm Fri 31/03 Mon 3/04  
OTFE1715 Wed 5/04 & Thu 6/04 7:40am-4pm Freezer Wed 5/04 6am-2pm / Chiller Thu 6/04 6am-2pm Fri 7/04 Mon 10/04  
OTFE1716 Wed 12/04 & Thu 13/04 7:40am-4pm Freezer Wed 12/04 6am-2pm / Chiller Thu 13/04 6am-2pm Fri 14/04 Mon 17/04  
OTFE1717 Wed 19/04 & Thu 20/04 7:40am-4pm Freezer Wed 19/04 6am-2pm / Chiller Thu 20/04 6am-2pm Fri 21/04 Mon 24/04  

. . . TOP WESTERN


* Top Western Island grouping includes Boigu (Talbot), Dauan (Mt Cornwallis) and Saibai islands.
* ETA's change at short notice due to operational requirements so be sure to check back regularly.
* The Newcastle Bay carries all freight ex Cairns and Horn Island (Ngurupai) and is the trans-shipment hub for freight for the Top Western Islands.
*Back-loading needs a Pick-up form, PC (Pre-Consignment paid) and all AQIS requirements completed. If AQIS clearance isn't completed, we cannot carry the freight.
* All freight to be backloaded (once the above is finalised - Pick Up Form, PC & AQIS Clearance) can only be received at the ramp whilst the vessel is in.
* 10' containers at 2.5 tonne are the maximum size/weight available to be transported. 20' containers are not available.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to email/otsioog)(seaswift.com.au
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

VoyageGeneral Cargo
& DG Receival 
Freezer / Chiller
Receival
Departure DatePlanned ArrivalUpdated Arrival
OTTW1713 Wed 22/03 & Thu 23/03 7:40am-4pm Freezer Wed 22/03 6am-2pm / Chiller Thu 23/03 6am-2pm Fri 24/03 Mon 27/03 DAU, SAI, Tue 28/03 BOI  28/3 DAU, SAI; 29/3 BOI
OTTW1714 Wed 29/03 & Thu 30/03 7:40am-4pm Freezer Wed 29/03 6am-2pm / Chiller Thu 30/03 6am-2pm Fri 31/03 Mon 3/04 DAU, SAI, Tue 4/04 BOI  
OTTW1715 Wed 5/04 & Thu 6/04 7:40am-4pm Freezer Wed 5/04 6am-2pm / Chiller Thu 6/04 6am-2pm Fri 7/04 Mon 10/04 DAU, SAI, Tue 11/04 BOI  
OTTW1716 Wed 12/04 & Thu 13/04 7:40am-4pm Freezer Wed 12/04 6am-2pm / Chiller Thu 13/04 6am-2pm Fri 14/04 Mon 17/04 DAU, SAI, Tue 18/04 BOI  
OTTW1717 Wed 19/04 & Thu 20/04 7:40am-4pm Freezer Wed 19/04 6am-2pm / Chiller Thu 20/04 6am-2pm Fri 21/04 Mon 24/04 DAU, SAI, Tue 25/04 BOI  

. . . LOWER WESTERN


* The Lower Western Island group includes Badu, Mabuiag and Moa with it's two communities of Kubin & St Pauls.  These communities are received in Cairns at different times though with Badu & Kubin received Friday & Monday; and Mabuiag & St Pauls received Wednesday & Thursday.
* The Trinity Bay carries all freight ex Cairns. Horn Island (Ngurupai) is the trans-shipment hub for freight for the Lower Western Islands.
* ETA's change at short notice due to operational requirements so be sure to check back regularly.
* Back-loading needs a Pick-up form, PC (Pre-Consignment paid) and all AQIS requirements completed. If AQIS clearance isn't completed, we cannot carry the freight.
* All freight to be backloaded (once the above is finalised - Pick Up Form, PC & AQIS Clearance) can only be received at the ramp whilst the vessel is in.
* 10' containers at 2.5 tonne are the maximum size/weight available to be transported. 20' containers are not available.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to email/otsioog)(seaswift.com.au
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

VoyageGeneral Cargo
& DG Receival
Freezer / Chiller
Receival
Departure DatePlanned ArrivalUpdated Arrival
OTBK1713 Wed 22/03 & Thu 23/03 7:40am-4pm Freezer Wed 22/03 6am-2pm / Chiller Thu 23/03 6am-2pm Fri 24/03 Mon 27/03 BAD, KUB; Wed 29/03 MAB, STP  
OTBK1714 Wed 29/03 & Thu 30/03 7:40am-4pm Freezer Wed 29/03 6am-2pm / Chiller Thu 30/03 6am-2pm Fri 31/03 Mon 3/04 BAD, KUB; Wed 5/04 MAB, STP  
OTBK1715 Wed 5/04 & Thu 6/04 7:40am-4pm Freezer Wed 5/04 6am-2pm / Chiller Thu 6/04 6am-2pm Fri 7/04 Mon 10/04 BAD, KUB; Wed 12/04 MAB, STP  
OTBK1716 Wed 12/04 & Thu 13/04 7:40am-4pm Freezer Wed 12/04 6am-2pm / Chiller Thu 13/04 6am-2pm Fri 14/04 Mon 17/04 BAD, KUB; Wed 19/04 MAB, STP  
OTBK1717 Wed 19/04 & Thu 20/04 7:40am-4pm Freezer Wed 19/04 6am-2pm / Chiller Thu 20/04 6am-2pm Fri 21/04 Mon 24/04 BAD, KUB; Wed 26/04 MAB, STP  

. . . CROSS HARBOUR


* The Cross Harbour services runs between Thursday Island (Waiben) and Horn Island (Ngurupai) predominantly but also services Prince of Wales (Murulag) weekly.
*** Denotes weekly run & day
* Please arrive at Depot 20 minutes before departure to complete any paperwork.
* ETA's change at short notice due to operational requirements so be sure to check back regularly.
* PC (Pre-Consignment paid) and all AQIS requirements completed. If AQIS clearance is required and isn't completed, we cannot carry the freight.
* All freight to be backloaded (once the above is finalised - Pick Up Form, PC & AQIS Clearance) can only be received at the ramp whilst the vessel is in.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to email/otsioog)(seaswift.com.au
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

Daily Voyage
Leaves RampFreezer / Chiller
Receival
Departure DatePlanned ArrivalUpdated Arrival
 Horn Island to TI 08:00, 10:30, 13:00, 15:30  daily 08:00, 10:30, 13:00, 15:30  daily Four times  Daily Four times Daily  
 TI to Horn Island 08:45, 11:30, 13:45, 16:00  daily 08:45, 11:30, 13:45, 16:00  daily  Four times  Daily Four times  Daily  
 ***HI to Hammond Monday 14:30  Monday 14:30  Monday Monday late Depends on Tide
HI to POW Freight need dependent Freight need dependent Freight need dependent Freight need dependent Please Call for information

THURSDAY ISLAND


* Thursday Island (Waiben) is serviced twice weekly ex Cairns and is the main administrative hub for the Torres Strait.
* ETA's change due to operational requirements so be sure to check back regularly.
* PC (Pre-Consignment paid) and all AQIS requirements completed. If AQIS clearance isn't completed, we cannot carry the freight.
* All freight to be backloaded (once the above is finalised - Pick Up Form, PC & AQIS Clearance) can only be received at the ramp whilst the vessel is in.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to email/otsioog)(seaswift.com.au
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

VoyageGeneral Cargo & DG ReceivalFreezer / Chiller
Receival
Departure DatePlanned ArrivalUpdated Arrival
TBNF1713 Fri 24/03 11am-4pm & Mon 27/03 7:40am-4pm Mon 27/03 6am-2pm Tues 28/03 Thu 30/03  
NBNF1713 Wed 29/03 & Thu 30/03 7:40am-4pm (Essentials Only) Freezer Wed 29/03 6am-2pm / Chiller Thu 30/03 6am-2pm Fri 31/03 Sun 2/04  
TBNF1714 Fri 31/03 11am-4pm & Mon 3/04 7:40am-4pm Mon 3/04 6am-2pm Tues 4/04 Thu 6/04  
NBNF1714 Wed 5/04 & Thu 6/04 7:40am-4pm (Essentials Only) Freezer Wed 5/04 6am-2pm / Chiller Thu 6/04 6am-2pm Fri 7/04 Sun 9/04  
TBNF1715 Fri 7/04 11am-4pm & Mon 10/04 7:40am-4pm Mon 10/04 6am-2pm Tues 11/04 Thu 13/04  
NBNF1715 Wed 12/04 & Thu 13/04 7:40am-4pm (Essentials Only) Freezer Wed 12/04 6am-2pm / Chiller Thu 13/04 6am-2pm Fri 14/04 Sun 16/04  
TBNF1716 Tues 18/04 7:30am-12pm Tues 18/04 6am-12pm Tues 18/04 Thu 20/04  
NBNF1716 Wed 19/04 & Thu 20/04 7:40am-4pm (Essentials Only) Freezer Wed 19/04 6am-2pm / Chiller Thu 20/04 6am-2pm Fri 21/04 Sun 23/04  

SEISIA (NPA)


* ETA's change due to operational requirements so be sure to check back regularly
* PC (Pre-Consignment paid).
* All freight to be backloaded can only be received at the ramp whilst the vessel is in.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to email/otsioog)(seaswift.com.au
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

VoyageGeneral Cargo
& DG Receival
Freezer / Chiller
Receival
Departure DatePlanned ArrivalUpdated Arrival
TBNF1713 Fri 24/03 11am-4pm & Mon 27/03 7:40am-4pm Mon 27/03 6am-2pm Tues 28/03 Fri 31/03 8am  
NBNF1713 Wed 29/03 & Thu 30/03 7:40am-4pm (Essentials Only) Freezer Wed 29/03 6am-2pm / Chiller Thu 30/03 6am-2pm Fri 31/03 Sun 2/04 8am  
TBNF1714 Fri 31/03 11am-4pm & Mon 3/04 7:40am-4pm Mon 3/04 6am-2pm Tues 4/04 Fri 7/04 8am  
NBNF1714 Wed 5/04 & Thu 6/04 7:40am-4pm (Essentials Only) Freezer Wed 5/04 6am-2pm / Chiller Thu 6/04 6am-2pm Fri 7/04 Sun 9/04 8am  
TBNF1715 Fri 7/04 11am-4pm & Mon 10/04 7:40am-4pm Mon 10/04 6am-2pm Tues 11/04 Fri 14/04 8am  
NBNF1715 Wed 12/04 & Thu 13/04 7:40am-4pm (Essentials Only) Freezer Wed 12/04 6am-2pm / Chiller Thu 13/04 6am-2pm Fri 14/04 Sun 16/04 8am  
TBNF1716 Tues 18/04 7:30am-12pm Tues 18/04 6am-12pm Tues 18/04 Fri 21/04 8am  
NBNF1716 Wed 19/04 & Thu 20/04 7:40am-4pm (Essentials Only) Freezer Wed 19/04 6am-2pm / Chiller Thu 20/04 6am-2pm Fri 21/04 Sun 23/04 8am  

WEIPA


* PC (Pre-Consignment paid). 
* All freight to be backloaded can only be received at the ramp whilst the vessel is in.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to email/otsioog)(seaswift.com.au
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

VoyageGeneral Cargo & DG ReceivalFreezer / Chiller
Receival
Departure DatePlanned ArrivalUpdated Arrival
TBNF1713 Fri 24/03 11am-4pm & Mon 27/03 7:40am-4pm (Essentials Only) Mon 27/03 6am-2pm Tues 28/03 Sat 1/04 6am  
NBNF1713 Wed 29/03 & Thu 30/03 7:40am-4pm Freezer Wed 29/03 6am-2pm / Chiller Thu 30/03 6am-2pm Fri 31/03 Mon 3/04 6am  
TBNF1714 Fri 31/03 11am-4pm & Mon 3/04 7:40am-4pm (Essentials Only) Mon 3/04 6am-2pm Tues 4/04 Sat 8/04 6am  
NBNF1714 Wed 5/04 & Thu 6/04 7:40am-4pm Freezer Wed 5/04 6am-2pm / Chiller Thu 6/04 6am-2pm Fri 7/04 Mon 10/04 6am  
TBNF1715 Fri 7/04 11am-4pm & Mon 10/04 7:40am-4pm (Essentials Only) Mon 10/04 6am-2pm Tues 11/04 Sat 15/04 6am  
NBNF1715 Wed 12/04 & Thu 13/04 7:40am-4pm Freezer Wed 12/04 6am-2pm / Chiller Thu 13/04 6am-2pm Fri 14/04 Mon 17/04 6am  
TBNF1716 Tues 18/04 7:30am-12pm (Essentials Only) Tues 18/04 6am-12pm Tues 18/04 Sat 22/04 6am  
NBNF1716 Wed 19/04 & Thu 20/04 7:40am-4pm Freezer Wed 19/04 6am-2pm / Chiller Thu 20/04 6am-2pm Fri 21/04 Mon 24/04 6am  

AURUKUN


* ETA's change due to operational requirements so be sure to check back regularly
* Back-loading needs a Pick-up form, PC (Pre-Consignment paid).
* All freight to be backloaded (once the above is finalised - Pick Up Form, PC & AQIS Clearance) can only be received at the ramp whilst the vessel is in.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to email/otsioog)(seaswift.com.au
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

VoyageGeneral Cargo
& DG Receival
Freezer / Chiller
Receival
Departure DatePlanned ArrivalUpdated Arrival
TBNF1713 Fri 24/03 11am-4pm & Mon 27/03 7:40am-4pm Mon 27/03 6am-2pm Tues 28/03 Fri 31/03 pm  
TBNF1714 Fri 31/03 11am-4pm & Mon 3/04 7:40am-4pm Mon 3/04 6am-2pm Tues 4/04 Fri 7/04 pm  
TBNF1715 Fri 7/03 11am-4pm & Mon 10/04 7:40am-4pm Mon 10/04 6am-2pm Tues 11/04 Fri 14/04 pm  
TBNF1716 Tues 18/04 7:30am-12pm Tues 18/04 6am-12pm Tues 18/04 Fri 21/04 pm  

LOCKHART RIVER


* Back-loading needs a Pick-up form, PC (Pre-Consignment paid).
* All freight to be backloaded (once the above is finalised - Pick Up Form and PC) can only be received at the ramp on Thursday mornings.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to email/otsioog)(seaswift.com.au
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

VoyageGeneral Cargo
& DG Receival
Freezer / Chiller
Receival
Departure DatePlanned ArrivalUpdated Arrival
TBNF1713 Fri 24/03 11am-4pm & Mon 27/03 7:40am-4pm Mon 27/03 6am-2pm Tues 28/03 Fri 31/03 am  
TBNF1714 Fri 31/03 11am-4pm & Mon 3/04 7:40am-4pm Mon 3/04 6am-2pm Tues 4/04 Fri 7/04 am  
TBNF1715 Fri 7/03 11am-4pm & Mon 10/04 7:40am-4pm Mon 10/04 6am-2pm Tues 11/04 Fri 14/04 am  
TBNF1716 Tues 18/04 7:30am-12pm Tues 18/04 6am-12pm Tues 18/04 Fri 21/04 am  

CORAL SEA


ETA's change due to operational requirements so be sure to check back regularly.

VoyageGeneral Cargo
& DG Receival
Freezer / Chiller
Receival
Departure DatePlanned ArrivalUpdated Arrival
CFTZ1706 Thu 23/03 7:30am-4pm & Fri 24/03 7:30am-12pm Fri 24/03 6am-12pm Sun 26/03 Mon 27/03 Fitzroy Island  
CCFM1707 Mon 27/03 7:30am-4pm & Tues 28/03 7:30am-12pm Tues 28/03 6am-12pm Tues 28/03 Wed 29/03 Cape Flattery  
CLIZ1706 Wed 29/03 7:30am-4pm & Thu 30/03 7:30am-12pm Wed 29/03 6am-12pm Thu 30/03 Fri 31/03 Lizard Island  
CGRE1713 Thu 30/03 7:30am-4pm & Fri 31/03 7:30am-12pm Fri 31/03 6am-12pm Sat 1/04 Sun 2/04 Green Island  

  Shipping-Schedule-Feb-2017.pdf Good-Friday-Easter-2017.pdf   Easter-Monday-2017.pdf

  East-Coast-Mothershipping-Schedule-2017.pdf