Keeping Northern Australia Connected

Schedules
We specialise in
General Cargo

Sea Swift delivers scheduled freight and cargo services up and down the east coast of Australia, through the Torres Strait and Cape York Peninsula, and throughout the Northern Territory.

Project & charter

When it comes to large-scale projects that need to ship large mobile plant, bulk fuels, construction materials, modular housing, worksite buildings, terrain cranes and prime movers, Sea Swift stands alone.

Mothershipping

With our specialised motherships, Sea Swift helps to ensure scores of fishing vessels are well provisioned with fuel, water, food stuffs, beverages and a large selection of the everyday consumables that sustain life at sea.

Defence

Our Defence Services division has vast experience delivering complex and sensitive maritime support operations to Australian Government agencies and naval forces.

Fuel

Sea Swift is a leader in the safe and reliable transportation of fuel and oils, providing a high-level service to large-scale companies and other businesses across northern Australia.

Engineering

Our dedicated Engineering team prides itself on being able to deliver first-class solutions across our whole range of sea and land-based assets.

Adventure Cruise

We operate the last remaining working cargo vessel to carry passengers in Australia, with the MV Trinity Bay traversing the stunning waterways of the Coral Sea and the Torres Strait.

You’re in good hands
Sea Swift has a long and successful history in Northern Australia of more than 30 years.

Sea Swift is ideally positioned to support, assist, and deliver to customers, from individuals to large national and international corporations.
Live schedule
Last updated 24 FEB 20 - 10:00
Queensland
cairns-departure-schedules
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
SEE DOCUMENTS UNDER PREVIOUS COLUMN
horn-island
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
TBNF2009Fri 21/2 8:30am-4pm & Mon 24/2 7:40am-4pmFreezer Fri 21/2 6am-2pm & Chiller Mon 24/2 6am-2pmTue 25/2Thu 27/2
NBNF2009Wed 26/2 7:40am-4pm &
Thu 27/2 8:30am-4pm
Freezer Wed 26/2 6am-2pm & Chiller Thu 27/2 6am-2pmFri 28/2Sun 1/3
TBNF2010Fri 28/2 8:30am-4pm & Mon 2/3 7:40am-4pmFreezer Fri 28/2 6am-2pm & Chiller Mon 2/3 6am-2pmTue 3/3Thu 5/3
NBNF2010Wed 4/3 7:40am-4pm &
Thu 5/3 8:30am-4pm
Freezer Wed 4/3 6am-2pm & Chiller Thu 5/3 6am-2pmFri 6/3Sun 8/3
TBNF2011Fri 6/3 8:30am-4pm & Mon 9/3 7:40am-4pmFreezer Fri 6/3 6am-2pm & Chiller Mon 9/3 6am-2pmTue 10/3Thu 12/3
NBNF2011Wed 11/3 7:40am-4pm &
Thu 12/3 8:30am-4pm
Freezer Wed 11/3 6am-2pm & Chiller Thu 12/3 6am-2pmFri 13/3Sun 15/3

* ETA’s change due to operational requirements so be sure to check back regularly.
* PC (Pre-Consignment) paid and all AQIS requirements completed. If AQIS clearance isn’t completed, we cannot carry the freight.
* Backload Freight needs to be dropped off as follows:
Tuesday Service
– 3pm Tuesday for vehicles, boats & over-dimensional cargo
– 12pm Wednesday for all other freight
– Ready for collection in Cairns from 11am the following Tuesday
Friday Service
 12pm Friday for all freight
– Ready for collection in Cairns from 11am the following Friday
* All freight needs to packaged for sea carriage

central-coconut-warraber-yam
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
OTCT2008Fri 21/2 8:30-4pm & Mon 24/2 7:40am-4pmFreezer Fri 21/2 6am-2pm & Chiller Mon 24/2 6am-2pmTue 25/2Fri 28/2WAR 28/2 1200
YAM 28/2 1600
COC 29/2 0700
OTCT2009Fri 28/2 8:30-4pm & Mon 2/3 7:40am-4pmFreezer Fri 28/2 6am-2pm & Chiller Mon 2/3 6am-2pmTue 3/3Fri 6/3
OTCT2010Fri 6/3 8:30-4pm & Mon 9/3 7:40am-4pmFreezer Fri 6/3 6am-2pm & Chiller Mon 9/3 6am-2pmTue 10/3Fri 13/3
OTCT2011Fri 13/3 8:30-4pm & Mon 16/3 7:40am-4pmFreezer Fri 13/3 6am-2pm & Chiller Mon 16/3 6am-2pmTue 17/3Fri 20/3

* Central Island group includes Coconut (Poruma), Warraber (Sue) and Yam (Iama).
* Service is every Friday, unless advised. Schedule is live, please refer to our Website
* Freight is shipped on the Tuesday Service ex-Cairns departing Horn Island every Thursday Evening.
* Horn Island (Ngurupai) is the trans-shipment hub for the freight to travel to the Central Islands on one of the Malu vessels.
* Back-loading needs a Pick-up form, PC (Pre-Consignment paid) and all AQIS requirements completed. If AQIS clearance isn’t completed, we cannot carry the freight.
* All freight to be backloaded (once the above is finalised – Pick Up Form, PC & AQIS Clearance) can only be received at the ramp whilst the vessel is in.
* 10′ containers at 2.5 tonne are the maximum size/weight available to be transported. 20′ containers are not available.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to otsioog@seaswift.com.au. Please enquire on Project and Charter Service or email to projects@seaswift.com.au to notify us of your needs.
* For large projects, tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

eastern-darnley-murray-stephens-yorke
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
STEPHENS ISLAND - Please see Document in Previous Column
OTFE2008Wed 19/2 & Thu 20/2 7:40am-4pmFreezer Wed 19/2 6am-2pm & Chiller Thu 20/2 6am-2pmFri 21/2Mon 24/2YOR 25/2 0800
DAR 25/2 1530
MER 26/2 1000
OTFE2009Wed 26/2 & Thu 27/2 7:40am-4pmFreezer Wed 26/2 6am-2pm & Chiller Thu 27/2 6am-2pmFri 28/2Mon 2/3
OTFE2010Wed 4/3 & Thu 5/3 7:40am-4pmFreezer Wed 4/3 6am-2pm & Chiller Thu 5/3 6am-2pmFri 6/3Mon 9/3
OTFE2011Wed 11/3 & Thu 12/3 7:40am-4pmFreezer Wed 11/3 6am-2pm & Chiller Thu 12/3 6am-2pmFri 13/3Mon 16/3

Stephen’s Island 2019 Schedule

* Eastern Island grouping includes Darnley (Erub), Murray (Mer), Stephens (Ugar) & Yorke (Masig).
*** Denotes weeks when Stephens Island is serviced***
* ETA’s change at short notice due to operational requirements so be sure to check back regularly.
* The Newcastle Bay carries all freight ex Cairns and Horn Island (Ngurupai) is the trans-shipment hub for freight to travel to the Eastern Islands.
* Back-loading needs a Pick-up form, PC (Pre-Consignment paid) and all AQIS requirements completed. If AQIS clearance is required and isn’t completed, we cannot carry the freight.
* All freight to be backloaded (once the above is finalised – Pick Up Form, PC & AQIS Clearance) can only be received at the ramp whilst the vessel is in.
* 10′ containers at 2.5 tonne are the maximum size/weight available to be transported. 20′ containers are not available.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to otsioog@seaswift.com.au.
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

top-western-boigu-dauan-saibai
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
OTTW2007Wed 19/2 & Thu 20/2 7:40am-4pmFreezer Wed 19/2 6am-2pm & Chiller Thu 20/2 6am-2pmFri 21/2Mon 24/2DAU 25/2 1030
BOI 25/2 1530
SAI 26/2 0900
OTTW2008Wed 26/2 & Thu 27/2 7:40am-4pmFreezer Wed 26/2 6am-2pm & Chiller Thu 27/2 6am-2pmFri 28/2Mon 2/3
OTTW2009Wed 4/3 & Thu 5/3 7:40am-4pmFreezer Wed 4/3 6am-2pm & Chiller Thu 5/3 6am-2pmFri 6/3Mon 9/3
OTTW2010Wed 11/3 & Thu 12/3 7:40am-4pmFreezer Wed 11/3 6am-2pm & Chiller Thu 12/3 6am-2pmFri 13/3Mon 16/3

* Top Western Island grouping includes Boigu (Talbot), Dauan (Mt Cornwallis) and Saibai islands.
* ETA’s change at short notice due to operational requirements so be sure to check back regularly.
* The Newcastle Bay carries all freight ex Cairns and Horn Island (Ngurupai) and is the trans-shipment hub for freight for the Top Western Islands.
*Back-loading needs a Pick-up form, PC (Pre-Consignment paid) and all AQIS requirements completed. If AQIS clearance isn’t completed, we cannot carry the freight.
* All freight to be backloaded (once the above is finalised – Pick Up Form, PC & AQIS Clearance) can only be received at the ramp whilst the vessel is in.
* 10′ containers at 2.5 tonne are the maximum size/weight available to be transported. 20′ containers are not available.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to otsioog@seaswift.com.au.
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

lower-western-badu-kubin-mabuiag-st-pauls
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
OLTW2007Wed 19/2 & Thu 20/2 7:40am-4pmFreezer Wed 19/2 6am-2pm & Chiller Thu 20/2 6am-2pmFri 21/2Mon 24/2BAD 24/2 0600
STP 24/2 0730
KUB 24/2 1200
MAB 24/2 1200
OLTW2008Wed 26/2 & Thu 27/2 7:40am-4pmFreezer Wed 26/2 6am-2pm & Chiller Thu 27/2 6am-2pmFri 28/2Mon 2/3
OLTW2009Wed 4/3 & Thu 5/3 7:40am-4pmFreezer Wed 4/3 6am-2pm & Chiller Thu 5/3 6am-2pmFri 6/3Mon 9/3
OLTW2010Wed 11/3 & Thu 12/3 7:40am-4pmFreezer Wed 11/3 6am-2pm & Chiller Thu 12/3 6am-2pmFri 13/3Mon 16/3

* The Lower Western Island group includes Badu, Mabuiag and Moa with it’s two communities of Kubin & St Pauls.
* The Newcastle Bay carries all freight ex Cairns. Horn Island (Ngurupai) is the trans-shipment hub for freight for the Lower Western Islands.
* ETA’s change at short notice due to operational requirements so be sure to check back regularly.
* Back-loading needs a Pick-up form, PC (Pre-Consignment paid) and all AQIS requirements completed. If AQIS clearance isn’t completed, we cannot carry the freight.
* All freight to be backloaded (once the above is finalised – Pick Up Form, PC & AQIS Clearance) can only be received at the ramp whilst the vessel is in.
* 10′ containers at 2.5 tonne are the maximum size/weight available to be transported. 20′ containers are not available.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to otsioog@seaswift.com.au.
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

cross-harbour-ti-horn-hammond-pow
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
Horn Island to TI08:00, 10:30, 13:00, 15:30 daily08:00, 10:30, 13:00, 15:30 dailyFour times dailyFour times daily
TI to Horn Island08:45, 11:30, 13:45, 16:00 daily08:45, 11:30, 13:45, 16:00 dailyFour times dailyFour times daily
***HI to HammondTuesday 14:30Tuesday 14:30TuesdayTuesday lateMon 24/2 1430
HI to POWFridayFridayFridayFridaySat 29/2 0700

* The Cross Harbour services runs between Thursday Island (Waiben) and Horn Island (Ngurupai) predominantly but also services Prince of Wales (Murulag) weekly.
*** Denotes weekly run & day
* Please arrive at Depot 20 minutes before departure to complete any paperwork.
* ETA’s change at short notice due to operational requirements so be sure to check back regularly.
* PC (Pre-Consignment paid) and all AQIS requirements completed. If AQIS clearance is required and isn’t completed, we cannot carry the freight.
* All freight to be backloaded (once the above is finalised – Pick Up Form, PC & AQIS Clearance) can only be received at the ramp whilst the vessel is in.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to otsioog@seaswift.com.au.
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

thursday-island
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
TBNF2008Fri 21/2 8:30am-4pm & Mon 24/2 7:40am-4pmFreezer Fri 21/2 6am-2pm & Chiller Mon 24/2 6am-2pmTue 25/2Thu 27/2
NBNF2008Wed 26/2 7:40am-4pm & Thu 27/2 7:40am-4pmFreezer Wed 26/2 6am-2pm & Chiller Thu 27/2 6am-2pmFri 28/2Sun 1/3
TBNF2009Fri 28/2 8:30am-4pm & Mon 2/3 7:40am-4pmFreezer Fri 28/2 6am-2pm & Chiller Mon 2/3 6am-2pmTue 3/3Thu 5/3
NBNF2009Wed 11/3 7:40am-4pm & Thu 12/3 7:40am-4pmFreezer Wed 11/3 6am-2pm & Chiller Thu 12/3 6am-2pmFri 13/3Sun 15/3
TBNF2010Fri 13/3 8:30am-4pm & Mon 19/3 7:40am-4pmFreezer Fri 13/3 6am-2pm & Chiller Mon 19/3 6am-2pmTue 17/3Thu 19/3
NBNF2010Wed 25/3 7:40am-4pm & Thu 26/3 7:40am-4pmFreezer Wed 25/3 6am-2pm & Chiller Thu 26/3 6am-2pmFri 20/3Sun 22/3
TBNF2011Fri 13/3 8:30am-4pm & Mon 19/3 7:40am-4pmFreezer Fri 13/3 6am-2pm & Chiller Mon 19/3 6am-2pmTue 24/3Thu 27/3

* Thursday Island (Waiben) is serviced twice weekly ex Cairns and is the main administrative hub for the Torres Strait.
* ETA’s change due to operational requirements so be sure to check back regularly.
* PC (Pre-Consignment paid) and all AQIS requirements completed. If AQIS clearance isn’t completed, we cannot carry the freight.
* All freight to be backloaded (once the above is finalised – Pick Up Form, PC & AQIS Clearance) can only be received at the ramp whilst the vessel is in.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to otsioog@seaswift.com.au.
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

seisia-npa
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
TBNF2008Fri 21/2 8:30am-4pm & Mon 24/2 7:40am-4pmFreezer Fri 21/2 6am-2pm & Chiller Mon 24/2 6am-2pmTue 25/2Thu 27/2
NBNF2008Wed 26/2 7:40-4pm & Thu 27/2 7:40am-4pmFreezer Wed 26/2 6am-2pm & Chiller Thu 27/2 6am-2pmFri 28/2Sun 1/3
TBNF2009Fri 28/2 8:30am-4pm & Mon 2/3 7:40am-4pmFreezer Fri 28/2 6am-2pm & Chiller Mon 2/3 6am-2pmTue 3/3Thu 5/3
NBNF2009Wed 11/3 7:40-4pm & Thu 12/3 7:40am-4pmFreezer Wed 11/3 6am-2pm & Chiller Thu 12/3 6am-2pmFri 13/3Sun 15/3
TBNF2010Fri 13/3 8:30am-4pm & Mon 16/3 7:40am-4pmFreezer Fri 13/3 6am-2pm & Chiller Mon 16/3 6am-2pmTue 17/3Thu 19/3
NBNF2010Wed 18/3 7:40-4pm & Thu 19/3 7:40am-4pmFreezer Wed 18/3 6am-2pm & Chiller Thu 19/3 6am-2pmFri 20/3Sun 22/3
TBNF2011Fri 20/3 8:30am-4pm & Mon 23/3 7:40am-4pmFreezer Fri 20/3 6am-2pm & Chiller Mon 23/3 6am-2pmTue 24/3Thu 26/3

* ETA’s change due to operational requirements so be sure to check back regularly.
* PC (Pre-Consignment paid).
* All freight to be backloaded can only be received at the ramp whilst the vessel is in.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to otsioog@seaswift.com.au.
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

weipa
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
NBNF2010Wed 26/2 & Thu 27/2 7:40am-4pmFreezer Wed 26/2 6am-2pm & Chiller Thu 27/2 6am-2pmFri 28/2Mon 2/3
NBNF2011Wed 4/3 & Thu 5/3 7:40am-4pmFreezer Wed 4/3 6am-2pm & Chiller Thu 5/3 6am-2pmFri 6/3Mon 9/3
NBNF2012Wed 11/3 & Thu 12/3 7:40am-4pmFreezer Wed 11/3 6am-2pm & Chiller Thu 12/3 6am-2pmFri 13/3Mon 16/3
NBNF2013Wed 18/3 & Thu 19/3 7:40am-4pmFreezer Wed 18/3 6am-2pm & Chiller Thu 19/3 6am-2pmFri 20/3Mon 23/3
NBNF2014Wed 25/3 & Thu 26/3 7:40am-4pmFreezer Wed 25/3 6am-2pm & Chiller Thu 26/3 6am-2pmFri 27/3Mon 30/3
NBNF2015Wed 1/4 & Thu 2/4 7:40am-4pmFreezer Wed 1/4 6am-2pm & Chiller Thu 2/4 6am-2pmFri 3/4Mon 6/4

* PC (Pre-Consignment paid).
* All freight to be backloaded can only be received at the ramp whilst the vessel is in.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to otsioog@seaswift.com.au.
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

aurukun
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
TBNF2009Fri 21/2 8:30am-4pm & Mon 24/2 7:40am-4pmFreezer Fri 21/2 6am-2pm & Chiller Mon 24/2 6am-2pmTue 25/2Fri 28/2
TBNF2010Fri 28/2 8:30am-4pm & Mon 2/3 7:40am-4pmFreezer Fri 28/2 6am-2pm & Chiller Mon 2/3 6am-2pmTue 3/3Fri 6/3
TBNF2011Fri 6/3 8:30am-4pm & Mon 9/3 7:40am-4pmFreezer Fri 6/3 6am-2pm & Chiller Mon 9/3 6am-2pmTue 10/3Fri 14/3
TBNF2012Fri 14/3 8:30am-4pm & Mon 16/3 7:40am-4pmFreezer Fri 14/3 6am-2pm & Chiller Mon 16/3 6am-2pmTue 17/3Fri 20/3
TBNF2013Fri 20/3 8:30am-4pm & Mon 23/3 7:40am-4pmFreezer Fri 20/3 6am-2pm & Chiller Mon 23/3 6am-2pmTue 24/3Fri 27/3

* ETAs change due to operational requirements so be sure to check back regularly.
* Back-loading needs a Pick-up form, PC (Pre-Consignment paid).
* All freight to be backloaded (once the above is finalised – Pick Up Form, PC & AQIS Clearance) can only be received at the ramp whilst the vessel is in.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to otsioog@seaswift.com.au.
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

lockhart-river
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
TBNF2009Fri 21/2 8:30am-4pm & Mon 24/2 7:40am-4pmFreezer Fri 21/2 6am-2pm & Chiller Mon 24/2 6am-2pmTue 25/2Fri 28/2
TBNF2010Fri 28/2 8:30am-4pm & Mon 2/3 7:40am-4pmFreezer Fri 28/2 6am-2pm & Chiller Mon 2/3 6am-2pmTue 3/3Fri 6/3
TBNF2011Fri 6/3 8:30am-4pm & Mon 9/3 7:40am-4pmFreezer Fri 6/3 6am-2pm & Chiller Mon 9/3 6am-2pmTue 10/3Fri 13/3
TBNF2012Fri 13/3 8:30am-4pm & Mon 16/3 7:40am-4pmFreezer Fri 13/3 6am-2pm & Chiller Mon 16/3 6am-2pmTue 17/3Fri 20/3
TBNF2013Fri 20/3 8:30am-4pm & Mon 23/3 7:40am-4pmFreezer Fri 20/3 6am-2pm & Chiller Mon 23/3 6am-2pmTue 24/3Fri 27/3

* Back-loading needs a Pick-up form, PC (Pre-Consignment paid).
* All freight to be backloaded (once the above is finalised – Pick Up Form and PC) can only be received at the ramp on Thursday mornings.
* Ensure at least 4 weeks notice is given for construction projects and any project requirements should be directed to otsioog@seaswift.com.au.
* For large projects tug & barge sets are available (TUG and BARGE) from 1,500t to 3,500t dependent on load and destination.

coral-sea-cape-flattery-fitzroy-green-lizard
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
Fitzroy Island - fortnightly
CFTZ1930Fri 21/2 7:30am-12pmFreezer & Chiller Fri 21/2 6am-10:30amMon 24/2Mon 24/2
CFTZ1931Fri 28/2 7:30am-12pmFreezer & Chiller Fri 28/2 6am-10:30amMon 2/3Mon 2/3
CFTZ1932Fri 13/3 7:30am-12pmFreezer & Chiller Fri 13/3 6am-10:30amMon 16/3Mon 16/3
CFTZ1933Fri 27/3 7:30am-12pmFreezer & Chiller Fri 27/3 6am-10:30amMon 30/3Mon 30/3
Lizard Island - fortnightly
CLIZ1931Wed 26/02 7:30am-12pmFreezer & Chiller Tue 25/02 6am-11amWed 26/2Thu 27/2
CLIZ1932Wed 11/03 7:30am-12pmFreezer & Chiller Tue 10/03 6am-11amWed 11/3Thu 12/3
CLIZ1933Wed 25/03 7:30am-12pmFreezer & Chiller Tue 24/03 6am-11amWed 25/3Thu 26/3
CLIZ1934Wed 8/04 7:30am-12pmFreezer & Chiller Tue 7/04 6am-11amWed 8/04Thu 9/04
Green Island - weekly
CGRE2007Fri 28/2 7:30am-12pmFreezer & Chiller Fri 28/2 6am - 10amSat 29/2Sun 1/3
CGRE2008Fri 6/3 7:30am-12pmFreezer & Chiller Fri 6/3 6am - 10amSat 7/3Sun 8/3
CGRE2009Fri 13/3 7:30am-12pmFreezer & Chiller Fri 13/3 6am - 10amSat 14/3Sun 15/3
CGRE2010Fri 20/3 7:30am-12pmFreezer & Chiller Fri 20/3 6am - 10amSat 21/3Sun 22/3
Cape Flattery - fortnightly
CCFM1930Mon 24/2 7:30am-12pmFreezer & Chiller Mon 24/2 6am-10amMon 24/2Tue 25/2
CCFM1931Mon 9/3 7:30am-12pmFreezer & Chiller Mon 9/3 6am-10amMon 9/3Tue 10/3
CCFM1932Mon 23/3 7:30am-12pmFreezer & Chiller Mon 23/3 6am-10amMon 23/3Tue 24/3
CCFM1933Mon 6/4 7:30am-12pmFreezer & Chiller Mon 6/4 6am-10amMon 6/4Tue 7/4

ETA’s change due to operational requirements so be sure to check back regularly.

Northern Territory
nt-australia-day-2020
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
SEE PREVIOUS COLUMN FOR AUSTRALIA DAY SCHEDULE
croker-island-goulburn-island
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
ARLC2007Thu 13/02/20 3pmFri 14/02/20 10amFri 14/02/20Wed 19/02/20Wed 19th GLB 10:30am & CKR 5pm
ARLC2008Thu 20/02/20 3pmFri 21/02/20 10amFri 21/02/20Wed 26/02/20Wed 26th GLB 9am & CKR 5pm
ARLC2009Thu 27/02/20 3pmFri 28/02/20 10amFri 28/02/20Wed 04/03/20TBA
ARLC2010Thu 05/03/20 3pmFri 06/03/20 10amFri 06/03/20Wed 11/03/20TBA

Receivals Open 8am – 4pm Mon-Fri Excluding Public Holidays.

Freezer/Chiller to be received before 10am on the day.

elcho-island
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
EANT2008Fri 14/02/20 3pmMon 17/02/20 10amMon 17/02/20Fri 21/02/20Fri 21st ELC 6am
ARLC2008Wed 19/02/20 3pmThu 20/02/20 10amThu 20/02/20Mon 24/02/20Mon 24th ELC 6am
EANT2009Fri 21/02/20 3pmMon 24/02/20 10amMon 24/02/20Fri 28/02/10Fri 28th ELC 8am
ELET2009Wed 26/02/20 3pmThu 27/02/20 10amThu27/02/20Mon 02/03/20Mon 2nd ELC 09:30am
gove
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
GTEA2007Wed 12/02/20 3pmThu 13/02/20 10amThu 13/02/20Mon 17/02/20Pick up Tue 18th
EANT2008Fri 14/02/20 3pmMon 17/02/20 10amMon 17/02/20Thu 20/02/20Pick up Fri 21st
GTEA2008Wed 19/02/20 3pmThu 20/02/20 10amThu 20/02/20Mon 24/02/20Pick up Tue 25th
EANT2009Fri 21/02/20 3pmMon 24/02/20 10amMon 24/02/20Thu 27/02/20Pick up Fri 28th

NT Shipping Schedule

  • Receivals Open 8am – 4pm Mon-Fri Excluding Public Holidays.
  • Freezer/Chiller to be received before 10am on the day.
groote-eylandt
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
GTEA2007Wed 12/02/20 3pmThu 13/02/20 10amThu 13/02/20Mon 17/02/20Pick up Tue 18th
GTEA2008Wed 19/02/20 3pmThu 20/02/20 10amThu 20/02/20Mon 24/02/20Pick up Tue 25th
GTEA2009Wed 26/02/20 3pmThu 27/02/20 10amThu 27/02/20Mon 02/03/20Pick up Tue 2nd
GTEA2010Wed 04/03/20 3pmThu 05/03/20 10amThu 05/03/20Mon 09/03/20Pick up Tue 10th

NT Shipping Schedule

  • Receivals Open 8am – 4pm Mon-Fri Excluding Public Holidays.
  • Freezer/Chiller to be received before 10am on the day.
gulf-ports-bickerton-island-umbakumba-numbulwar
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
GULF2007Wed 12/02/20 3pmThu 13/02/20 10amThu 13/02/20Wed 19/02/20Thu 20th UMB 6am, BIK 2:20pm & Fri 21st NUM 11:40am
GULF2008Wed 19/02/20 3pmThu 20/02/20 10amThu 20/02/20Wed 26/02/20Wed 26th BIK 4:20pm, Thu 27th NUM 3:30pm & Fri 28th UMB 6am
GULF2009Wed 26/02/20 3pmThu 27/02/20 10amThu 27/02/20Wed 04/03/20Thu 5th UMB 6am, BIK 2pm & Fri 6th NUM 10:40am
GULF2010Wed 04/03/20 3pmThu 05/03/20 10amThu 05/03/20Wed 11/03/20TBA

NT Shipping Schedule

  • Receivals Open 8am – 4pm Mon-Fri Excluding Public Holidays.
  • Freezer/Chiller to be received before 10am on the day.
lake-evella
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
ELET2007Wed 12/02/20 3pmThu 13/02/20 10amThu 13/02/20Tue 18/02/20Tue 18th LEV 2:40pm
ELET2008Wed 19/02/20 3pmThu 20/02/20 10amThu 20/02/20Tue 25/02/20Tue 25th LEV 8:40am
ELET2009Wed 26/02/20 3pmThu 27/02/20 10amThu 27/02/20Tue 03/03/20Tue 3rd LEV 2:20pm
ELET2010Wed 04/03/20 3pmThu 05/03/20 10amThu 05/03/20Tue 10/03/20TBA

Receivals Open 8am – 4pm Mon-Fri Excluding Public Holidays.

Freezer/Chiller to be received before 10am on the day.

maningrida
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
EANT2008Fri 14/02/20 3pmMon 17/02/20 10amMon 17/02/20Wed 19/02/20Wed 19th MAN 6am
ARLC2008Thu 20/02/20 3pmFri 21/02/20 10amFri 21/02/20Mon 24/02/20Mon 24th MAN 8am from depot
EANT2009Fri 21/02/20 3pmMon 24/02/20 10amMon 24/02/20Wed 26/02/20Wed 26th MAN 6:30am
ARLC2009Thu 27/02/20 3pmFri 28/02/20 10amFri 28/02/20Mon 02/03/20TBA

Receivals Open 8am – 4pm Mon-Fri Excluding Public Holidays.

Freezer/Chiller to be received before 10am on the day.

milingimbi-ramingining
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
ARLC2007Thu 13/02/20 3pmFri 14/02/20 10amFri 14/02/20Tue 18/02/20Tue 18th MIL 8am & RAM 5pm
ARLC2008Thu 20/02/20 3pmFri 21/02/20 10amFri 21/02/20Tue 25/02/20Tue 25th MIL 8am & RAM 1pm
ARLC2009Thu 27/02/20 3pmFri 28/02/20 3pmFri 28/02/20Tue 03/03/20TBA
ARLC2010Thu 05/03/20 3pmFri 06/03/20 10amFri 06/03/20Tue 10/03/20TBA

Receivals Open 8am – 4pm Mon-Fri Excluding Public Holidays.

Freezer/Chiller to be received before 10am on the day.

tiwis
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
TIWB2008Fri 14/02/20 3pmMon 17/02/20 10amMon 17/02/20Tue 18/02/20Tue 18th BTI 6am, GPT 6am & PRU 10:30am
TIWA2008Tue 18/02/20 3pmWed 19/02/20 10amWed 19/02/20Thu 20/02/20Thu 20th BTI 6am, GPT 6am & Fri 21st SNB 6am
TIWB2009Fri 21/02/20 3pmMon 24/02/20 10amMon 24/02/20Tue 25/02/20Tue 25th BTI 6am, GPT 6am & PRU 12pm
TIWA2009Tue 25/02/20 3pmWed 26/02/20 10amWed 26/02/20Thu 27/02/20Thu 27th BTI 6am, GPT 6am & Fri 28th SNB 5:30am

Receivals Open 8am – 4pm Mon-Fri Excluding Public Holidays.

Freezer/Chiller to be received before 10am on the day.

Mothershipping
2020-mothershipping-schedule-east-coast
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
2019-mothershipping-schedule-gulf-of-carpentaria
VOYAGEGeneral Cargo & DG Receive ByFreezer Chiller Receive ByDEPARTURE DATEPLANNED ARRIVALUPDATED ARRIVAL
KB191120.09.1923.09.1924.09.1914.10.19
KB191204.10.1908.10.19 (6am–11am)08.10.1928.10.19
KB191318.10.1921.10.1922.10.1911.11.19
KB191401.11.1904.11.1905.11.1925.11.19

NORTHBOUND FREIGHT

BULK & PALLETISED DRY FREIGHT
Deliver to Sea Swift main depot via gate 2 (liberty Street entrance)
Fridays from 6am to 2.00pm as per the schedule dates.

LOOSE DRY & CHILLER / FREEZER
Deliver to Sea Swift main depot via gate 3 (liberty Street entrance)
Mondays from 6am to 2.00pm as per the schedule dates

Our Routes
Our Depots
Make a booking